loader

THAMES WATER LIVING FILTER INSTALLATION 24th April 2015

THAMES WATER LIVING FILTER INSTALLATION PROJECT BRIEF Assigned to compile the comprehensive and vigorous paperwork required by Thames Water to undertake the installation of a living filter at Farmoor Resevoir.  The project comprised of several phases but primarily in the construction and anchoring systems for a series of floating reed beds housed in gabion baskets located in front of the pump house.  With the reservoir being man-made we used hydraulic machinery to drill into the reservoir substrate in which eyelets…

RIVER STOUR CONTAINMENT CURTAIN DEPLOYMENT/RECOVERY 24th April 2015

RIVER STOUR CONTAINMENT CURTAIN DEPLOYMENT/RECOVERY PROJECT BRIEF To compile a strategy and series of safe working practices for the mobilisation and demobilisation of the contractors bio-engineered containment curtain in order to conduct scour protection works within the River Stour. RESPONSIBILITIES I was overall responsible for ensuring that the sequence of carrying out all works were both methodical and logical in an effort to create a successful outcome without injury to personnel or damage to the equipment or supporting structures. CLIENT…

RIVER STOUR SCOUR PROTECTION SYSTEMS 24th April 2015

RIVER STOUR SCOUR PROTECTION SYSTEMS PROJECT BRIEF The installation of scour protection surrounding the cutwater section of a main pier structure spanning the river stour.  This project used a pumpable micro concrete mix that was operated from a topside unit and directed into position by the diver.  Prior to carrying out the works, we had to prepare the area using hydraulic underwater cutting equipment to clear a number of subsurface obstructions. RESPONSIBILITIES As director of operations and project manager I…

RIVER AVON SCOUR PROTECTION SYSTEMS 23rd April 2015

RIVER AVON SCOUR PROTECTION SYSTEMS PROJECT BRIEF The installation of eco sensitive scour protection systems around the abutment structure of a main line railway bridge spanning the River Avon.  With   the site being of SSSI and the land privately owned by the Royalty Fisheries, strict protocol and operating procedures had to be adhered to at all times making this project both ambitious and complex.  With rock armour already in situ we were initially assigned to create a mattress formulated…

RIVER AVON CONTAINMENT CURTAIN DEPLOYMENT/RECOVERY 22nd April 2015

RIVER AVON CONTAINMENT CURTAIN DEPLOYMENT/RECOVERY PROJECT BRIEF To compile a strategy and series of safe working practices for the mobilisation and demobilisation of our prototype containment curtain measuring 60m in horizontal length and 4m in vertical draft in a fast flowing, narrow river with abutments, cutwaters and pier structures all within close proximity. RESPONSIBILITIES As director of operations and principle project manager I was ultimately responsible for ensuring that the sequence of carrying out all works was both methodical and…

RIVER TRENT CONTAINMENT CURTAIN DEPLOYMENT/RECOVERY 24th March 2015

RIVER TRENT CONTAINMENT CURTAIN DEPLOYMENT/RECOVERY PROJECT BRIEF Initial brief was to install a containment curtain for construction works to commence.  Due to the fast flowing nature of this River the curtain had to be secured to the river bed via a number deadweights which comprised of x8 RSJ’s.  Upon completion of works we were contracted in the removal of the curtain, assigned the task to remove the anchor weights and finally the ground chain that was used to keep the…

TORRY QUAY CONTAINMENT CURTAIN INSTALLATION 24th March 2015

TORRY QUAY CONTAINMENT CURTAIN INSTALLATION PROJECT BRIEF To secure supplied brackets to the wharf exterior which would be used to attach a purpose built articulating containment curtain during excavation works.  The brackets were provided by our client and our task was to deploy and install the curtain in situ terminating at each side of the entrance where we had installed the brackets.  Once completed excavation works could commence by onsite contractors with the curtain providing sufficient containment of sediment and…

ROCK ROLL MATTRESS INSTALLATIONS 11th February 2015

ROCK ROLL MATTRESS INSTALLATIONS PROJECT BRIEF Used as a temporary scour protection measure, our brief was to install a series of rock rolls to form a rock roll mattress that was capable of resisting high velocities and shear stress loads of up to 1200 k/N which equates to around 120 ton-force within a high energy river.  This system was temporary but it provided a suitable instant and flexible solution where other bioengineering techniques would be less effective.  The rolls were…

Stacey Rivers Project Management