TRINITY LANDING PONTOON MAINTENANCE 24th March 2015

TRINITY LANDING PONTOON MAINTENANCE PROJECT BRIEF To undertake routine maintenance works subsurface, consisting of surveys, investigations, tightening and replacement of all underwater fixings.  All survey works consisted of accurate recording and photography detailing non-conformances which ultimately over a period of time provided a suitable trend analysis of problematic areas.  Maintenance routines were developed from the non-conformances and trend analysis with periodic replacement of fixings undertaken bi-annually.  Each fixing was correctly tightened using a hydraulic torque wrench both topside and underwater….

UNDERWATER ANTI CORROSIVE COATING SYSTEMS 11th February 2015

UNDERWATER ANTI CORROSIVE COATING SYSTEMS PROJECT BRIEF To source and project manage the application of an underwater coating system to protect the main supporting steel structure of the lifeboat slipway.  My company was tasked to complete all underwater works assigned to this project. RESPONSIBILITIES Project Manager for all subsea works.  Responsible for sourcing a corrosion coating system that was environmentally friendly which had good adhesion and corrosive protection properties for this harsh and unforgiving environment. I was also responsible for…

Stacey Rivers Project Management